Limited representing Phuket District 2 introduced his intention to lift a important issue in Parliament concerning the rapidly built road over the hills from Chalong to Patong. Constructed last 12 months following a landslide on Patong Hill, this highway has since been met with concerns about its condition and cost-effectiveness.
The road, named Luang Phu Supha Road, was inspected by MP Chalermpong Saengdee yesterday, who highlighted the situation of the street that serves as a significant throughway connecting the island. He claimed the new road was already significantly broken and hardly usable.
These issues are compounded by the road’s skinny surface, measuring only two to 3 centimetres in thickness, and indicators of potential slides on the right aspect of the street. The MP’s concerns centre across the cost-effectiveness of the road’s building and the harm it has already sustained.
“For this, I might be submitting a question to Parliament to discover a conclusion as rapidly as potential.”

The street was built following a decree from Phuket Governor Narong Woonciew, who declared the landslide on Patong Hill a catastrophe final October. This declaration allowed funds from the provincial catastrophe aid fund to be allotted for highway improvements.
Despite no accidents or deaths resulting from the landslide, the street enhancements had been deemed essential to minimise disruption to important visitors to and from Patong, a major tourism hub in Phuket, reported The Phuket News.
Work on the new street commenced lower than per week after the landslide, with the road being utilized by folks as early as March this yr, regardless of only being surfaced with crushed rock. As a end result, there have been considerations in regards to the security of the street, significantly as several sections over the hills are exceptionally steep and still unpaved.
Tiwap Seedokbuab, Deputy President of Phuket Provincial Administration Organization (PPAO), voiced concerns about the security of street users. He famous that the PPAO supposed to cover the dust sections of the highway with concrete however confronted finances constraints and required approval from the Phuket Provincial Forestry Office to have a piece of the road surfaced with asphalt.
Tiwap additional mentioned that the highway not solely serves as an alternative path to and from Patong however could additionally turn out to be a Phuket vacationer attraction due to its scenic views. However, despite these plans and discussions, there was no progress towards making the street safer since March.
The complete price of the challenge, as nicely as the amount spent thus far, remains undisclosed. Seedokbuab declined to offer a figure for the development prices in March, stating they had been nonetheless finalising it.
Follow extra of The Thaiger’s newest tales on our new Facebook web page HERE..

Leave a Reply